TPM Teamwork

The pillar team
Creates the condition to empower people ensuring that everybody’s skills and capabilities development come first
Enables the condition to create a lean organisation implementing new management systems for Quality, Maintenance, Planning, Problem Solving, etc.
Improves the organisational structure empowering the more operational levels (i.e. activating autonomous teams)
Coaches to guarantee the success of new organization and behaviours
It is recommended to have at least one PKE per pillar in order to ensure good training, coaching, mentoring, auditing.

Pillar Team Composition

Selection and management of the Pillar Team is crucial to achieving the pillar aims and objectives.
Membership should be:

  • From a broad functional background
  • Committed to the process
  • Willing and able to give the necessary time
  • Familiar with the pillar process, tools & techniques
  • Pillar leader should be the department manager in order to ensure the correct alignment and the single agenda approach.
  • It is recommended that the FI pillar leader is the Brewery Mgr

How to set-up the Pillar?

Pillar Team

  • Pillar Team Composition
  • Link between Steering Committee, Pillar Teams and Loss Reduction Teams
  • Generic Role & Responsibility of the Pillar Team
  • Role of Model Machines / Teams
  • Loss Reduction Teams
  • Loss Reduction Team Planning / Scheduling

Pillar Vision and Mission – What is a Vision and Mission?

Vision

  • What the team aspires to achieve in a medium-long period
  • A clear future picture of where the business, pillar or project would like to be and what it would look like captured as a single statement or a collection of simple phrases or pictures
  • It should be possible to describe the vision with figures.

Mission

  • It’s the reason why a pillar exists
  • A statement of intent that provides the direction by which the vision can be realised
Strategy
  • How to achieve the vision
Vision

  • Maintaining the Zero Losses process conditions at the lowest cost

Mission

  • The pillars must first of all identify, quantify and deploy the losses
  • Then must develop the know-how and support teams in the eradicating the sources of these losses
  • Finally, the pillars must switch the mindset from result control to process control and to and efficient conditions management system.
  • At each one of this step the focus and the responsibility is closer and closer to the shop floor.


When do we launch Pillars?

Pillars are launched once the site has developed enough experience and needs to move forward with more powerful means to support teams and gain additional tools to attack losses.
To ensure this background the following pre-requisites should be met:
  • The pillar leaders have participated in several teams
  • The pillar members should have participated in at least one team
  • Routes for the specific pillar have been applied in the site
  • Model machines / examples have been established as a learning tool and reference for the future teams to follow
For example one of the biggest challenges of the AM pillar is to manage the restoration of basic conditions particularly the level of cleanliness. Therefore it is vital to have a reference machine; this is known as the model machine. The model machine therefore sets the STANDARD for cleanliness throughout the entire brewery site. This is why the AM Pillar has to own and manage the model machine, allowing them to understand what is involved in maintaining basic conditions

Tuesday, 9 July 2013

When do we launch Pillars?

Pillars are launched once the site has developed enough experience and needs to move forward with more powerful means to support teams and gain additional tools to attack losses.
To ensure this background the following pre-requisites should be met:
The pillar leaders have participated in several teams
The pillar members should have participated in at least one team
Routes for the specific pillar have been applied in the site
Model machines / examples have been established as a learning tool and reference for the future teams to follow
For example one of the biggest challenges of the AM pillar is to manage the restoration of basic conditions particularly the level of cleanliness. Therefore it is vital to have a reference machine; this is known as the model machine. The model machine therefore sets the STANDARD for cleanliness throughout the entire brewery site. This is why the AM Pillar has to own and manage the model machine, allowing them to understand what is involved in maintaining basic conditions

Some advice on balance of team activities

Effects of too many Pillar activities vs. few improvement teams
Heineken Western Europe experience:
Insufficient results or “loss of improvement opportunities”
“Waste of mental energy” in activity without added value
Low involvement of shop floor
Slow expansion of the methodology and of the mind set evolution
Frustration in FI, PQ, PM pillars
Pillars working in silo: lack of integrated approach
Impact on credibility of the TPM program

The main activities of a Pillar

The main activities of a pillar are:
Loss intelligence
Deployments
Teams management
Choice and launch of teams
Training
Remove barriers: coaching, empowering, supporting
Auditing
Building of the system
A pillar team:
Should carry out the relevant Loss analysis and deployments
Supports the Steering Team in the Gap analysis and choice of improvement teams
Supports the training and development of improvement teams
Removes barriers to success for the teams
Audits the teams and reports critical points
Develops “Systems” to prevent losses (e.g. preventive maintenance system or machine board audit system)
Support and develop people for the new way of working
Drive TPM as a common way of working

Pillars: what are they for?

Pillars must ensure the development of an effective promotion organisation of TPM, defining:
structure, roles and responsibilities of the operating committees and of pillar teams,
the system of relationships linking them one another (meeting system, reporting and audits),
their way of working and the necessary tools (project master plan, project management system)

What is a Pillar?

A Pillar is a cross-functional group of people responsible for:
Execution and improvement of our processes in a sustainable way
Reduction of one or more losses types using the relevant routes